Owners Guide

14
Napoli Use, Care, and Installation Guide
NAPOLI
ISLAND
CORE
Installation Instructions
Mounting the Hood
Ceiling Preparation
1. Determine hood mounting location and
temporarily tape paper template (included with
the hood) to the ceiling.
2. Cut-out internal shaded area of template
to allow the ducting and electrical to pass
through.
3. Add wood blocking (min. 2” x 4”) onto ceiling
joists to reinforce ceiling above the drywall.
(FIG. C1).
4. Secure (2) #6 x 1” wood screws into points A
and B of the paper template (FIG. B). Do not
completely tighten screws, leave approximately
1/4” exposed.
Hood Preparation
5. Remove screws securing top and bottom
support frames together.
6. Adjust support frame to accommodate the
desired hood height and re-assemble the frame
using the previously removed screws (2 screws
for each support frame arm). (FIG. C2).
1
2
Ceiling Joists
Wood Blocking
Top Support Frame
Support Frame Arm
Bottom Support Frame
Hood Body
3
Mounting Screws
(pre-installed)
4
FIG. C
Hood is intended to be mounted to a finished
ceiling.
CAUTION
XP022220
A
B
Cut-Out Shaded Area
FIG. B
Front of Hood