Use and Care Manual

15
Roma Groove Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
Mounting the Hood
FIG. B
24” min.
A
B
Duct Cover Bracket
C/L
1. Adjust the mounting brackets by loosening (2) pre-
installed screws per bracket.
2. Mount the component box bracket onto the hood with (2)
M4 x 8 screws with the component box facing outwards.
3. Measure the range top to the hood bottom and mark line
A (24” minimum from the range top).
4. Mark the center line vertically.
5. Measure 11-3/8” above line A and mark the hood height,
line B. Measure 5-1/8” on line B from the C/L and mark
the mounting spread.
6. Mark the mounting spread vertically until a cross has
been formed to determine the exact placement of the M6
x 1” screws.
7. Fasten (2) M6 x 1” screws into the studs on line B, but do
not fully tighten them.
NOTE: Wood blocking may need to be added behind the drywall if no studs are present. Wall anchors
may also be used but check local codes for compliance. Failure to use suitable wall anchors
and screws to hold the weight of the hood could result in personal injury or damage to the
cooking surface or counter.
8. Hang the hood onto the mounting screws and hand tighten each screw. (FIG. B).
9. Center and attach the duct cover mounting bracket to the wall just below the ceiling or sot using
(2) M6 x 1” screws.
10. Install the electrical and ductwork. Seal the ductwork with aluminum duct tape. Power up the
hood and check for leaks around the duct tape.
11. Place the telescopic duct covers onto the hood and extend the inner (top) duct cover upwards.
Secure it to the duct cover bracket using (2) M4 x 8 screws.
NOTE: If using the hood in recirculating mode, you must secure the air diverter plate onto wall before
installing ductwork and duct covers. You will also need to install charcoal filters and brackets.
At least two installers are required due to the
weight and size of the hood.
CAUTION