Use and Care Manual

28
Roma Groove Use, Care, and Installation Guide
ROMA GROOVE
WALL
CORE
ACT™ Conversion
Enabling ACT
To enable ACT™:
1. Before hood installation, gain access to PC board by following the steps shown in FIG. I.
2. Change plastic jumper positioning as shown in FIG. J to set the desired maximum blower CFM.
3. Re-install PC board and continue with hood installation.
4. Remove the appropriate foil CFM sticker included with the hood literature and place inside the
hood body below the wiring diagram or in another clearly visible location.
To verify if your installer enabled ACT™:
1. With hood o, press and hold the power button for three seconds. If 5 LEDs illuminate = default
max. CFM, if 4 LEDs illuminate = max. 390 CFM, and if 3 LEDs illuminate = max. 290 CFM.
2. When ACT™ is enabled, the number of blower speeds will be reduced. 390 CFM = max. 4 speeds
and 290 CFM = max. 3 speeds.
3. There should also be a foil label located inside the hood body near the wiring diagram that
indicates the blower CFM.
PC Board
1
3
5
7
2
4
6
8
Jumper 5-6 or 7-8
DEFAULT POSITION
Default Max. Blower CFM
Jumper 3-4
Max. Blower CFM
390
Jumper 1- 2
Jumper Pins
Plastic
Jumper
1
3
5
7
2
4
6
8
1
3
5
7
2
4
6
8
1
3
5
7
2
4
6
8
Max. Blower CFM
290
Model: ZRG
- Locate PC board box on top of blower housing.
- Remove 2 to 4 screws attaching PC board cover.
FIG. I
FIG. J