ZP19003 ASSEMBLY INSTRUCTIONS NEWPORT VINYL FINISHING POST WITH NODIG STEEL PIPE ANCHOR KIT ASSEMBLY INSTRUCTIONS ZP19003 (36” HIGH) 10 MIN Approximate assembly time Want to see a video on how to assemble this product? Scan the QR code WWW.ZIPPITY-OUTDOOR.COM WWW.ZIPPITY-OUTDOOR.COM 1 VER.
ZP19003 ASSEMBLY INSTRUCTIONS GENERAL INFORMATION IMPORTANT k Check the inside of the larger pieces in your box for other materials packed inside. k When assembling components, place on a non-abrasive surface (i.e. shipping box) to avoid scratching. k We recommend an area approximately 5’x 8’ for unobstructed assembling. k You should not need to use excessive force when assembling components.
ZP19003 ASSEMBLY INSTRUCTIONS AVOID THESE PITFALLS! HAVE YOU CONTACTED YOUR LOCAL UTILITIES? 1 You must call your local utilities before you start installing your fence to avoid puncturing any unseen underground utilities, especially electrical or gas lines. Fortunately, this is made easy for you. k Simply call 811 in the US or visit www.call811.com. k In Canada, visit www.transcanada.com/contactus.html for a list of phone numbers by province.
ZP19003 ASSEMBLY INSTRUCTIONS 3 1/2 in 38 in 2 in 22 in 1 5/8 in 4 WWW.ZIPPITY-OUTDOOR.
ZP19003 ASSEMBLY INSTRUCTIONS STEP 1: LAY OUT MATERIALS A C Post Cap (1) B Post (1) 2" x 3½" x 38⅝" WWW.ZIPPITY-OUTDOOR.
ZP19003 ASSEMBLY INSTRUCTIONS THIS POST IS DESIGNED TO BE USED WITH THE NEWPORT VINYL FENCE WITH POST AND NO-DIG STEEL PIPE ANCHOR KIT (36”H X 74” W) (ZP19002). TOOL OPTIONS FOR DRIVING THE PIPE ANCHOR INTO THE GROUND: BEST Post Pounder BETTER 10lb Sledgehammer DO NOT USE GOOD 5lb Sledgehammer Hammer Purchase a post pounder at any hardware store, or go to www.wambamfence.com/ Post pounders cost roughly $25 to $30. 6 WWW.ZIPPITY-OUTDOOR.
ZP19003 ASSEMBLY INSTRUCTIONS STEP 2: INSTALL PIPE ANCHOR STEP 2.1 Drive your Pipe Anchor (C) just above the ground when Note: If your ground is dry and hard, use a claw hammer to loosen 2” to 4” of dirt around the base of the pipe anchor. C STEP 2.2 Try to drive the pipe anchor as level as possible. Check that the pipe is usually established and you cannot manually pull the pipe anchor back into level. Note: Check that the pipe anchor is level in WWW.ZIPPITY-OUTDOOR.
ZP19003 ASSEMBLY INSTRUCTIONS STEP 3: INSTALL POST OVER PIPE ANCHOR STEP 3.1 STEP 3.1 Orient the Post (B) with its tab at the top and slide the post over the pipe anchor down into the ground. Using a wood block, pound the post so to 4” is below the ground. B STEP 3.3 Secure the post to the pipe anchor with (2) 1” self-drilling hex head steel screws (not included). 8 WWW.ZIPPITY-OUTDOOR.
ZP19003 ASSEMBLY INSTRUCTIONS STEP 4: INSTALL POST CAP STEP 4.1 Install the Post Cap (A) . Push down on the post cap to lock it onto the post. A Note: The top of the post can be trimmed down as necessary. Use PVC glue (NOT INCLUDED) to permanently install the post cap as necessary. WWW.ZIPPITY-OUTDOOR.
ZP19003 ASSEMBLY INSTRUCTIONS 6935 Reames Rd. Ste. K. Charlotte, NC 28216 support@zippity-outdoor.com 704-892-5222 877-234-6196 WWW.ZIPPITY-OUTDOOR.COM 8 WWW.ZIPPITY-OUTDOOR.