Installation Sheet

Table Of Contents
4
6
7
8
9
Slide chimney over the angle irons
and place in position on top of
the
hood. Pull the electrical plug to
the top of the chimney.
Lift the hood to attach the angle
irons to the ceiling bracket. Use
screws pro-vided to attach. Chimney
should be cut 2.5in short to allow
for screwing angle irons into
bracket.
Make your electrical and
ducting connections. Use rigid duct
wherever possible. Try
and minimize
the use of elbows. More elbows and
longer runs create higher
static
pressure. The hood comes with a
grounded three prong plug that can
either be directly wired or plugged
into a 20 amp circuit.
Slide crown molding over the
crown molding bracket on the
ceiling.
Remove plastic wrap from all sides
and install stainless steel baffle
filters.
Before installing bae lters, make sure that you
insert the grease cup under the motor blower.
10