Owner's manual

502N TELEKOMUNIKACE a.s., www.2n.cz
®
1.
2.
3.
1.
2.
3.
Voltage control
Requirements
DC 12 to 48V voltage
The voltage signal must be active even during a power failure.
Procedure
Move the ALARM terminal two pins up into position (2).
For activation by voltage connection, leave the jumper as it is (5th pin on jumper
12) – ALARM without jumper fitted (factory setting).
For activation by voltage disconnection, fit the jumper (5th pin on jumper 12)
ALARM inverted – jumper fitted.
CANCEL Input Connection (Door Contact, Optional)
This input helps cancel a rescue request if the lift is fully functional. When the ALARM
button is pressed, the system waits for a pre-programmed period of time, which is a
little longer than the maximum lift running time. If the lift is functional, it arrives in the
required station within this timeout and opens the door. In that case, the rescue
request is cancelled. If the door does not open, the request is accepted.
Find out before installation whether the door opening signal is available in the lift cabin.
Requirements
If the lift has a double door, the signal must be active only if both the door sets
are open, i.e., if it is really possible to leave the cabin.
The door position signal has to work even in the case of power outage.
Contact control
Requirements
None of the contact outlets terminals may be connected electrically with any
other electrical circuit and no voltage source other than the NO/NC contact may
be connected to the CANCEL terminals.
Procedure
Leave the CANCEL terminal in the lower position (5).
f you use a make contact, leave the jumper as it is (6th pin on jumper 12)
CANCEL without jumper fitted (factory setting).
If you use a break contact, fit the jumper (6th pin on jumper 12) CANCEL
inverted – jumper fitted.
Warning
Ignoring the instructions above may lead to product damage.