Owner manual

3-2 Installation TCR Series User's Manual
Unpacking and Inspection
When you receive your TCR system, inspect the shipping carton for signs of physical damage.
Contact your dealer and the shipper immediately if you suspect any damage has occurred during
shipping. Check the contents of the box to ensure that all parts are included. If any items are
missing, contact your dealer immediately. After unpacking all equipment, please save the packing
materials for future shipping convenience.
Preparing Your Site
When preparing to install your TCR system, attention should be given to Environmental, Power and
Location requirements. Refer to Appendix C for mechanical and environmental specifications.
Environmental Requirements
The TCR is designed to operate in normal “machine room” or “control room” conditions.
Care must be taken to avoid temperature and humidity extremes.
Location and Power Requirements
When connecting the TCR, care should be taken to avoid power lines that are subject to noise
and voltage spikes. Do not install the system on a power circuit that is common to such
equipment as air conditioners and refrigeration units. An uninterruptable power supply
(UPS) is recommended if unstable power conditions are present.