Installation typically follows this sequence:
Remote Antenna Installation
Reader Installation
Quick Power-On Test
Antenna Lead Installation
Cable Connector Installation
Interface Connections
Transponder Usage
The following sections detail the procedures for completing the installations.
Remote Antenna Installation
Remote antenna locations will have been decided during the Pre-Installation
process. A description of this process begins on page 10. Refer to Figure 3.1,
3.2 and 3.3 for antenna orientation positions.