User's Manual
Table Of Contents
- Introduction and Basics
- Introduction
- Safety Information
- Installing and Moving Sprite
- Safety
- External Machine Diagram
- Machine Specifications
- Contact Information
- Basic Operation
- Sample Placement
- Contact Information
- Components
- Main Screen
- Begin a New Scan Screen
- Scanning Screen
- Scan Review Screen
- Processing Setup Screen
- Results Screen
- _
- Locate a Scan Screen
- Background Processing Screen
- Utilities Screen
- System Sleep Button
- Touch screen Calibration Button
- System Shutdown Button
- Storage Device Management Button
- Network Configuration Button
- One Touch Scan Setup Button
- Submit Trouble Ticket Button
- Reset Processing Engine Button
- Reset System Board Service Button
- Reset X-ray Service Button
- Reset Scan Engine Button
- System Restart Button
- System Status Screen
- X-ray System Maintenance Screen
- Common Elements
- Technical Support
Sprite User's Manual
Basic Operation
This section provides an overview of basic operation, or quick-start, of Sprite. Please read the
user’s manual for complete instructions and safety information.
Powering Sprite On and Off
To power Sprite on and off, you must insert the key into the key switch and turn it to the "on"
position. You may power Sprite on and off with the power switch located on the front of the
electronics enclosure, inside the lower cabinet. The system power switch activates and
deactivates the entire mechanical and software system.
Activating Sleep Mode
To conserve energy without turning off the machine, you may activate the sleep mode (in the
Utilities component). The touch screen will go dark with the exception of one remaining icon. To
"wake" Sprite, tap the screen.
Using the Touch screen Interface
Sprite is equipped with a touch screen for ease of use. Use your finger(s) to tap the screen’s
icons, enter settings and activate buttons.
Required Pre-Scan Procedures
Conditioning maintains the X-ray tube and prepares it for scanning. You may not begin a scan
unless the tube is conditioned; you will be notified of such. To begin conditioning, tap the X-ray
System Maintenance button on the main screen, and then tap the Begin Conditioning button.
Detector calibration prepares the detector for scanning and is essential for accurate image
acquisition. IMTEC recommends you calibrate the detector between once a day and once a
week. To begin detector calibration, tap the X-ray System Maintenance button on the main
screen, and then tap the Begin Calibration button.
Sprite offers
automatic X-ray conditioning and detector calibration.
CAUTION: Any liquid around Sprite should be considered a potential electrical shock hazard. You
should not spray, pour or otherwise allow any open fluids in Sprite's vicinity. If you plan on
scanning liquids, they must be nonflammable and in a sealed container.
12