Technical information

24
12.0 Finishing
12.1 Optional Step: For high stress situations,
you may wish to apply a small amount of
the 3M
Pronto
Instant Adhesive, CA-8
around the cable directly past the crimp
ring, and at the end of the body of the ST
Connector. Immediately install the strain
relief boot.
12.2 3M
Hot Melt ST Connector - Slide the
strain relief boot onto the back of the
connector.
12.3 3M
Hot Melt ST Connector - If the
connector is not to be immediately put into
service, install the protective dust cap.
12.4 3M
Hot Melt FC Connector - Slide the
strain relief boot onto the back of the
connector.
12.5 3M
Hot Melt FC Connector - If the
connector is not to be immediately put into
service, install the protective dust cap.
12.6 3M
Hot Melt SC Connector - Slide the
strain relief boot onto the back of the
connector, ensuring the flat sides of the
boot are in line with the flat sides of the
connector.
12.7 3M
Hot Melt SC Connector - Install the
outer shell of the connector by aligning the
profile of the connector’s outer shell, with
the connector body.
12.8 3M
Hot Melt SC Connector - Slide the
connector into the backside of the outer
shell. The shell will snap into place.
12.9 3M
Hot Melt SC Connector - If the
connector is not to be immediately put into
service, install the protective dust cap.