Technical information
24
12.0 Finishing
12.1 Optional Step: For high stress situations,
you may wish to apply a small amount of
the 3M
™
Pronto
™
Instant Adhesive, CA-8
around the cable directly past the crimp
ring, and at the end of the body of the ST
Connector. Immediately install the strain
relief boot.
12.2 3M
™
Hot Melt ST Connector - Slide the
strain relief boot onto the back of the
connector.
12.3 3M
™
Hot Melt ST Connector - If the
connector is not to be immediately put into
service, install the protective dust cap.
12.4 3M
™
Hot Melt FC Connector - Slide the
strain relief boot onto the back of the
connector.
12.5 3M
™
Hot Melt FC Connector - If the
connector is not to be immediately put into
service, install the protective dust cap.
12.6 3M
™
Hot Melt SC Connector - Slide the
strain relief boot onto the back of the
connector, ensuring the flat sides of the
boot are in line with the flat sides of the
connector.
12.7 3M
™
Hot Melt SC Connector - Install the
outer shell of the connector by aligning the
profile of the connector’s outer shell, with
the connector body.
12.8 3M
™
Hot Melt SC Connector - Slide the
connector into the backside of the outer
shell. The shell will snap into place.
12.9 3M
™
Hot Melt SC Connector - If the
connector is not to be immediately put into
service, install the protective dust cap.