User manual

20
7-INSTALLATION AND SET-UP (continued)
800rf-NA
2012 March
7.6 Pneumatic & Control Board Connections
(continued)
- Connect an air tube to the ON/OFF valve and
attach it with a strap.
Minimum inside diameter of the tube 10mm;
air pressure 6 BAR.
- Give air to the machine with the ON/OFF valve
(Figure 7-15).
Position the control board near the machine. Feeder
cables: Connect the cable with multipolar connectors
from the machine and from conveyor to the control
board (Figure 7-16).
Front and back junction boxes connections (1, 2 -
Figure 7-17 & 7-18):
2
1
Figure 7-15
Figure 7-16
Figure 7-18
Figure 7-17