User manual

11 - SET UP AND ADJUSTMENTS
30
2012 March
800rf-NA
11.1 Tape Loading on the Top Unit
Insert a tape roll on the drum and push it fully forward.
Attach the tape leg to the threading tool (supplied with
the tools kit) Figure 11-1.
Insert the plastic threading leader through the taping
unit. Take care to keep hands away from the tape
cutting blades (Figure 11-2 and 11-3).
Follow the path through the unit as shown on picture
(Figure 11-4) and make sure that the adhesive side is
placed on the correct side.
Pull and cut off the excess tape using a pair of
scissors as shown (Figure 11-5 and 11-6).
Figure 11-1
Figure 11-2
Figure 11-5
Figure 11-6
Adhesive
Adhesive
Figure 11-3
Adhesive
Adhesive
Adhesive
Adhesive
Figure 11-4