User's Manual

Octopus ATM Defense System
Installation and Operation Guide
Page D1
Appendix D
Configuration Jumper Selection
On both the MCU and CSU a number of jumpers provided to allow for configuring operation.
Definition:
Jumper, JXX -2 pin header assembly attached to PCB.
Shunt -2 pin shorting bar used to plug onto jumper to change state from open to closed circuit/
Jumper
Silkscreen
Indicator
Name Description
MCU
J4 POWER
With Battery installed, and connected, installation of this jumper enables power
to the MCU.
J25 UNUSED For future expansion.
J26 UNUSED For future expansion.
J24
ENABLE
MOTION
On power-up of the MCU, if this shunt is installed (default) motion detection for
alert and fire conditions will be enabled.
If motion detection is not required, remove shunt and POWER shunt, re-install
POWER shunt to affect configuration change.
J22
TILT
SELECTION
On power-up of the MCU, if this jumper-shunt is not installed (default), the MCU
expects that it will be mounted in the vertical plane with the sensor array jack
(RJ45) facing upwards.
If horizontal mounting is required, install shunt, cycle power by removing and
installing the POWER shunt.
J3 ENABLE SQUIB
On power-up of the MCU, if this jumper-shunt is installed (default), the MCU
will upon system fire also charge and fir a Squib for use with external smoke, or
ink.
If no external squib device is required remove the shunt. No power cycling is
required.
J28 ENABLE LIGHT
On the Brazil model of ctopus, a light sensor is attached for increased
functionality (see Software Flow Diagram). Placing this shunt enable the light
detection circuitry (only if light sensor, PC1, adjacent to self-test button, is
installed). Removing it will disable the light circuitry. No power cycling is
required.
CSU
J4 POWER
With Battery installed, and connected, installation of this jumper enables power
to the CSU.
J13 UNUSED For future expansion.
J14 UNUSED For future expansion.
J9
ENABLE LIGHT
SENSOR
If this jumper-shunt is installed (default), the CSU will use the light detector to
determine if the cassette lid is open or closed.
Removing this shunt disables light detection.
J11
TILT
SELECTION
On power-up of the CSU, if this jumper-shunt is not installed, the CSU expects
that it will be mounted in the vertical plane battery along the lower edge.
If horizontal mounting is required, install shunt, cycle power by removing and
installing the POWER shunt.
Jj3 ENABLE SQUIB
If this jumper-shunt is installed (default), the unit is capable of firing the ink
staining system. If not installed the unit will report error during self-test.
Squib Jumper must be installed to pass self-test.