User's Manual

8.0 Test Electronics
Test the CSU electronics by depressing and releasing SW9 (Figure 7). One
beep indicates that the CSU is fully functional. Two beeps indicates a failure
and requires troubleshooting. Recheck cable connections and shunt
connections (Section 6.0). This completes the installation
Page F7
Octopus ATM Defense System
Installation and Operation Guide