User's Manual

Figure 5
6.0 Replace Top Guides
Reinstall the screws, washers nuts and guide rails. Adjust the height of the
guide rails for the local currency.
7.0 Bracket Securing Screws
Remove and retain the four forward (leave the rear screws in place)screws
holding the left and right external plastic guide rails (Figure 5).
REMOVE
LEAVE
8.0 Bracket Preparation
Prepare the bracket and ink delivery system by removing the four nuts and the
CSU plastic cover. Locate J3 (Firing circuit) and J4 (Power). Remove the red
shunts and replace, bridging the two posts on each connector (Figure 6).
Replace the plastic cover and securing nuts. Make certain that the two-wire
electrical cable between the CSU electronics and the Ink Block is connected.
Figure 6
J4
J3
SW9
Page G5
Octopus ATM Defense System
Installation and Operation Guide