User's Manual

8.0 Check Fit
Close and open the lid several times to make sure that there
is no mechanical interference.
9.0 Test Electronics
Test the CSU electronics by depressing and releasing SW9 (Figure 8). One
beep indicates that the CSU is fully functional. Two beeps indicates a failure
and requires troubleshooting. Recheck cable connections and shunt
connections (Section 6.0). This completes the installation
Page I8Octopus ATM Defense System
Installation and Operation Guide