User Manual
Table Of Contents
- 1. Getting started
- 2. Introduction
- 3. Preparation
- 4. About the terminal
- 5. Mounting and installing the terminal
- 6. Connecting to the terminal
- 7. Managing the terminal
- 8. Configuring the terminal
- 9. Configuring the traffic interfaces
- 10. Cross Connections
- Embedded cross connect switch
- The Cross Connections application
- The Cross Connections system requirements
- Installing the Cross Connections application
- Opening the Cross Connections application
- The Cross Connections page
- Setting the terminal's address
- Management and user ethernet capacity
- Setting card types
- Getting cross connection configuration from the terminals
- Creating cross connections
- Sending cross connection configuration to the terminals
- Saving cross connection configurations
- Using existing cross connection configurations
- Printing the cross connection configuration
- Deleting cross connections
- Configuring the traffic cross connections
- Cross connection example
- Symmetrical Connection Wizard
- 11. Protected terminals
- 12. In-service commissioning
- What you will need
- Checking the antenna polarization
- Visually aligning antennas
- Accurately aligning the antennas
- Synchronizing the terminals
- Checking performance
- Checking the receive input level
- Checking the fade margin
- Checking long-term BER
- Bit Error Rate tests
- Additional tests
- Checking the link performance
- Viewing a summary of the link performance
- What you will need
- 13. Maintenance
- 14. Troubleshooting
- 15. Interface connections
- 16. Alarm types and sources
- 17. Country specific settings
- 18. Specifications
- Ethernet interface
- QJET Quad E1 / T1 interface
- Q4EM Quad 4 wire E&M interface
- DFXO Dual foreign exchange office interface
- DFXS Dual foreign exchange subscriber interface
- QV24 Quad V.24 asynchronous data interface
- HSS Single high speed synchronous data interface
- External alarm interfaces
- Auxiliary interfaces
- AC Power supply
- DC Power supply
- Power consumption
- MHSB protection
- Ethernet interface
- 19. Product end of life
- 20. Abbreviations
- 21. Acknowledgments and licensing
- 22. Commissioning Forms
- 23. Index
![](/manual/4rf/n2500aaaa0200a/user-manual-english-french/images/img-5.png)
Getting started | 11
1. Getting started
This section is an overview of the steps required to commission a link in the field.
Phase 1: Pre-installation
1. Confirm path planning. Page
19
2. Ensure that the site preparation is complete:
Power requirements
Tower requirements
Environmental considerations, for example, temperature control
Rack space
Page
22
3. Confirm the interface card configuration.
Phase 2: Installing the terminals
1. Before installing the terminal into the rack, check that all the required
interface cards are fitted.
Position and mount the terminal in the rack. Page
29
2. Connect earthing to the terminal. Page
24
3. Confirm that the:
Antenna is mounted and visually aligned.
Feeder cable is connected to the antenna.
Feeder connections are tightened to recommended level.
Tower earthing is complete.
4. Install lightning protection. Page
24
5. Connect the coaxial jumper cable between the lightning protection and the
terminal duplexer.
6. Connect the power supply to the terminal and apply power. Page
31