Installation Guide

1. Read enclosed detailed installation instructions before beginning install.
2. A
is a must!
3. Proper moisture testing is a must!
4. Proper expansion around all permanent structures is a must!
5. Molding, trim, transition, and
pieces must not prevent
6. Failure to follow installation instructions will void warranty.
7. Acclimation is normally not necessary but may be required in extreme circumstances.
Please Read All Instructions, Carefully, Before You Begin Installation.
Improper Installation Will Void Warranty
planks for defects such as chips and color variations under good light conditions. Check that
grooves are free of debris. Use planks from multiple boxes during installation to insure random pattern variation.
stacking the cartons. If stacking is necessary, stack the cartons in a crisscross manner - never stacking the cartons more
than three high.
area in which the is installed must remain *climate controlled with the temperature between
65°85°F for the life of the product.
55-95 F (12-53 C ) at least 48-hours before and during the installation, even if temporary temperature measures must be
(5 F) or higher than 95 (53 C), and RH must maintain between
35 – 70%. In these installations, you must use transition moldings at doorways and in any span greater than 40’ in any
*secured to the
top of or fasten trim/molding/transition pieces directly to the
*You may adhere A&A Surfaces Everlife SPC in light commercial and commercial installations using A&A Surfaces
MS007 adhesive, following directions on the pail.

Summary of content (6 pages)