Use and Care Manual

1. Read enclosed detailed installation instructions before beginning install.
2. Aatsuboorisamust!
3. Propermoisturetestingisamust!
4. Properexpansionaroundallpermanentstructuresisamust!
5. Molding,trim,transition,andnishpiecesmustnotpreventtheoorfromoating.
6. Failuretofollowinstallationinstructionswillvoidwarranty.
7. Acclimationisnormallynotnecessarybutmayberequiredinextremecircumstances.
PleaseCarefullyReadAllInstructionsBeforeYouBeginYourInstallation.
ImproperInstallationWillVoidWarranty
Always check ooring planks for defects such as chips and color variations under good light conditions. Check
that groove are free of debris. Useplanksfrommultipleboxes during installation to insure random
pattern variation.
This ooring should be stored and installed in a climate controlled area with an average temperature of 60-78°F
(18-25°C). If the humidity in the room of installation is below 35% or above 70%, the ooring must be acclimated
for a minimum for 24 hours by spreading out the cartons during acclimation but not stacking the cartons.
The area in which the ooring is installed must remain climate controlled with the temperature between 65- 78°F
(18-25°C) and humidity levels between 35%-70% for the life of the product.
This product is a oating oor and should NOT be secured to the oor. Do not install xed objects, such as
cabinets, on top of the ooring unless it is fully adhered and do not fasten trim/molding/transition pieces directly
to the oor.
Page 1 of 4

Summary of content (4 pages)