Installation Guide
Page 11
DRAIN/OVERFLOW INSTALLATION
INSTALLATION DRAIN/TROP-PLEIN
1"
25 mm
1"
25 mm
Minimum
1"
25 mm
1"
25 mm
Minimum
1"
25 mm
1"
25 mm
Minimum
❻
Screw the waste pipe to the T union. Slide the plasc washer,nut and pipe cover
onto the waste pipe.
Make sure all the pipes are properly aached to the bathtub. Slowly drop the
bathtub in place. Make sure the waste pipe overlaps 1" (25mm) inside the
P-trap.
Once the bathtub is in place verify that the levelling is correct. Next, do a drai-
nage test to ensure the bathtub drains properly, if not, adjust the levelling pads.
Once the levelling and drainage is correct, make sure that all plumbing ngs
are secured and properly xed. Assure yourself that there is no water leaks.
Visser le tuyau d'évacuaon au raccord en T. Placer la rondelle de plasque,
l'écrou et le cache-tuyau sur le tuyau d'évacuaon.
S'assurer que tous les tuyaux sont bien xés sur la baignoire. Descendre lente-
ment la baignoire en place. S'assurer que le tuyau d'évacuaon s'insère d'au
moins 1" à l'intérieur du siphon-P.
Prendre soin de vérier de nouveau la mise à niveau de la baignoire. Par la
suite, faire un test d'écoulement, an de s'assurer que la baignoire se draine
correctement. Au besoin, ajuster les paes de nivellement. Une fois, la mise
à niveau et l'égouement conforment, s'assurer que les raccords de plomberie
sont correctement xés et qu'il n'y a aucune fuite d'eau.