Operating Instructions and Installation Instructions
20
Filling the solar circuit
0°
non return valve is operating,
ow only in ow direction.
1. Put the ush and ll station into operation.
2. Flush the solar system for at least 15
minutes.
Open the ow restrictor [6] below the pump
(vertical position) several times for some
seconds in order to eliminate also the air in
the pump section.
3. Close the drain valve [7] with the lling pump
running and increase the system pressure to
approx. 5 bars. The system pressure can be
read on the manometer.
45°
non return valve is not operating,
ow in both directions.
6. Close the ll valve [5] and switch off the pump
of the ush and ll station.
7. Check the manometer to see whether the
system pressure reduces and eliminate leaks
where necessary.
8. Reduce the pressure on the drain valve [7] to
the system-specic pressure.
9. Connect the expansion tank to the solar
circuit and set the operating pressure of
the solar system by means of the ush and
ll station (see instructions regarding the
expansion tank).
10. Close the ll and drain valves [5|7] and open
the ow restrictor [6].
11. Put the check valve in the return into
operating position by turning the ball valve to
position 0º.
90°
Ball valve closed,
no ow.