Operating Instructions and Installation Instructions
21
Connecting control (only when using pump station with control)
1. Connect the controller to the mains. Set the
solar circuit pump in the manual mode to ON
by means of the controller manual.
2. Let the solar circuit pump run at maximum
rotation speed for at least 15 minutes.
3. If necessary, increase the system pressure to
the operating pressure.
4. Remove the hoses of the ush and ll station
and screw the sealing caps on the ll and
drain valves.
Setting the solar system
Reading edge:
Top edge of the oating body.
Example: 4.5 l/min
1. Set the desired ow rate by adjusting the
rotation speed of the solar circuit pump.
The current ow rate can be read at the
top edge of the oating body. Observe the
specications of the manufacturer of the
collectors for the correct adjustment of the
ow rate.
2. Mount the front shell on the solar pump
station.
3. Set the automatic operation on the controller
(see controller manual).