Operating Instructions and Installation Instructions

21
Connecting control (only when using pump station with control)
1. Connect the controller to the mains. Set the
solar circuit pump in the manual mode to ON
by means of the controller manual.
2. Let the solar circuit pump run at maximum
rotation speed for at least 15 minutes.
3. If necessary, increase the system pressure to
the operating pressure.
4. Remove the hoses of the ush and ll station
and screw the sealing caps on the ll and
drain valves.
Setting the solar system
Reading edge:
Top edge of the oating body.
Example: 4.5 l/min
1. Set the desired ow rate by adjusting the
rotation speed of the solar circuit pump.
The current ow rate can be read at the
top edge of the oating body. Observe the
specications of the manufacturer of the
collectors for the correct adjustment of the
ow rate.
2. Mount the front shell on the solar pump
station.
3. Set the automatic operation on the controller
(see controller manual).