May 2007 
Update of IOM unit service clearances. Length of front and back clearances from 60” to 48” and 
length of left and right side clearances from 100” each to interchangeable 48” and 70”. (Note: 
Units with hydronic heat must have 70” right side access for service.) Gas piping sizes table on 
page 10 was updated with new gas heater information. 
November 2007 
Update of the IOM Gas Piping Connection Sizes table. Connection sizes of Model Option B2 = 
A and B were changed to ¾” and the connection size of Model Option B2 = C, D, and E was 
changed to 1 ½”. 
September 2008 
Update of the IOM adding information about 16-25 and 30 ton RN Series units. 
May 2009 
Update of the IOM adding information about 9-15 ton RN Series units. The part number for the 
IOM was changed from R15710 to R79510. 
June 2009 
Update of the IOM making corrections to some of the values in the tables of Appendix A and 
adding e-coated coil cleaning instructions. 
August 2009 
Update of the IOM correcting the Gas Heater Operation section to have the same sequence of 
operation for both natural gas and propane gas heaters. 
September 2009 
Update of the IOM adding Refrigerant-to-Water heat exchanger and Thermostat Control Wiring 
information and correcting Table I7 Natural Gas Maximum Piping Capacities. 
April 2010 
Update of the IOM adding information about 6-10 ton RN Series units. The part number for the 
IOM was changed from R79510 to R90720. 
October 2010 
Update of the IOM to include 100% Return Air option in Feature 1, and Single Zone VAV 
controllers in feature 13. Feature 15 was changed from an empty feature to include Glycol 
percentage options. 
February 2011 
Added information regarding the charging of a heat pump and added additional information 
regarding freezing water in the heat exchanger. 