Instruction Manual
26 
Figure 1 - Lockable Handle 
The warranty card must be completed in full 
and  returned  to  AAON  not  more  than  3 
months after unit is delivered. 
Storage 
If  installation  will  not  occur  immediately 
following delivery, store equipment in a dry 
protected  area  away  from  construction 
traffic  and  in  the  proper  orientation  as 
marked  on the  packaging  with all  internal 
packaging in place. Secure all loose-shipped 
items. 
Packaged Direct Expansion (DX) Units 
All  DX  refrigeration  systems  are  factory 
assembled,  leak  tested,  charged  with 
refrigerant, and run tested. 
All  refrigerant  systems  include  an 
evaporator,  condenser,  liquid  line  filter 
driers, thermal expansion valves (TXV) and 
scroll  compressors.  Compressors  are 
equipped  with  a  positive  pressure  forced 
lubrication system. 
CRANKCASE HEATER 
OPERATION 
Some  units  are  equipped  with 
compressor  crankcase  heaters, 
which should be energized at  least 
24 hours prior to cooling operation, to 
clear  any  liquid refrigerant from  the 
compressors. 
   CAUTION  
COMPRESSOR CYCLING 
5 MINUTE MINIMUM OFF TIME 
To  prevent  motor  overheating 
compressors  must  cycle  off  for  a 
minimum of 5 minutes. 
5 MINUTE MINIMUM ON TIME 
To  maintain  the  proper  oil  level 
compressors  must  cycle  on  for  a 
minimum of 5 minutes. 
The  cycle  rate  must  not  exceed  6 
starts per hour. 
   WARNING 










