Instruction Manual
74 
Step 7: Determine the current blade pitch and the pin location for the new blades 
Table 23 - Pin Location 
Type 
Bushing 
Mount 
Blade Pitch Angle 
20° 
25° 
28° 
30° 
33° 
35° 
38° 
40° 
45° 
50° 
5Z 
A 
- 
RET 
- 
RET 
RET 
RET 
HUB 
HUB 
HUB 
HUB 
B 
- 
HUB 
- 
HUB 
HUB 
HUB 
RET 
RET 
RET 
RET 
Table 24 - Pin Groove Location 
Type 
Rot. 
Blade Pitch Angle 
20° 
25° 
28° 
30° 
33° 
35° 
38° 
40° 
45° 
50° 
5Z 
R 
- 
4 
- 
3 
2 
1 
4 
3 
2 
1 
L 
- 
1 
- 
2 
3 
4 
1 
2 
3 
4 
Step  8:  Replace  fan  blades  in  the  new  pin 
location and reassemble the fan 
Replace the blades with the pin in the 1, 2, 
3, or 4 groove position of either the HUB or 
RET. Assemble the fan making sure to place 
the blades in their previous blade sockets, to 
match  up  the  previous  orientation  of  HUB 
and  RET  and  to  replace  any  balancing 
weights in their previous locations. Tighten 
bolts  in  a  cross  pattern  to  5-6  ft-lbs.  of 
torque. 
Power Return and Exhaust Axial Flow 
Fans (26 and 31-140 tons) 
Blade Pitch Angle Setting Instructions 
Step 1: Determine the new required pitch for 
the fan blades 
Use  the  fan  program  in  AAON  ECat. 
Contact  the  AAON  parts  department  to 
acquire the new pitch pins for the fan blades. 
Step 2: Maintain the balance of fan 
Mark the hub plate castings across a single 
joint,  so the  fan  can be  reassembled  in  the 
same orientation. 
Mark the location of any balancing weight. 
Balancing  weight  will  be on  the outer  bolt 
circle, in the form of washers, and/or longer 
bolts, or an additional balancing nut. 
Number the blades and blade sockets, so that 
they  can  be  replaced  into  their  original 
positions. 
Figure 37 - Assembled Fan 
Step 3: Remove the mounting nuts and bolts 
and separate hub plate castings 
Figure 38 - Back of the Fan 
Bushing 
Mount 
Fan 
Blade 
Hub 










