Installation Instructions

Table Of Contents
1250$5&
,167580(17/$1',1*6<67(0
,167$//$7,21&200,66,21,1*+$1'%22.

1DYLD$YLDWLRQ$6

2.2 Adjustment points
The adjustment points are shown in Figure 2-3 Adjustment points and explained below. The
figure shows a fully equipped system, NM 7050D, see Section 3 for configuration details:
1. Battery charging voltage (nom 27.4V@20
°
C)
2. Bias for power transistor (use factory settings)
3. Battery protection cut-off voltage (nom. 22V)
4. Tx Detected Rf level (nom. 2.5V@4W carrier)
5. Monitor RF level (nom. 3V@nominal output power)
6. Monitor frontend input filter centre frequency (use factory settings)
7. Real time clock fine tuning(use factory settings)
The adjustment points marked
Use Factory Settings
should not be touched.
The baseband level has to be adjusted at installation.
The other are factory pre-set but may be adjusted.