Installation Instructions

Table Of Contents
1250$5&
 1DYLD$YLDWLRQ$6
,167580(17/$1',1*6<67(0
,167$//$7,21&200,66,21,1*+$1'%22.
3 Electrical Installation LLZ/GP
This paragraph describes the external electrical connections of the «NMnr» main cabinet.
3.1 Connection Overview
The ILS main cabinet consists of three connector sites, illustrated in Figure 3-1.
The ILS RF signals to and from the antenna system are connected at the top of the main
cabinet. These connectors may be moved to the top, see
Mechanical Installation
.
The power supply (supplies) and the backup battery are connected to the power connector
rail inside the cabinet back section.
All other external connections are sited on the CI1210A connection interface board inside
the cabinet back section
.
Figure 3-1 ILS main cabinet connection overview.
RF CONNECTIONS
CABLE FEEDTHROUGH
COU/SBO
CLR/SBO
CLR/CSB
OUT
COU/CSB
CLR
DS
NF
IN
CL
1 AC LEVEL MEASUREMENT
CI 1210A CONNECTIONS
8 DIGITAL INPUT/OUTPUT
3 DIFFERENTIAL ANALOG
2 TEMP SENSORS
1 DME
1 REMOTE CONTROL
3 RS 232
4 DC LOOPS
BATTERY
+27V
0V
POWER RAIL CONNECTIONS
SUPPLY
POWER
+27V
0V
HBK574-2