Table Of Contents
- Installation & Commissioning Handbook Vol. 1
- RECORD OF CHANGES
- TABLE OF CONTENTS
- SECTION 1 ANTENNA INSTALLATION PROCEDURE
- 1 Civil Work Checks
- 2 Localizer Antenna System Assembly
- 3 Glidepath antenna system assembly/towers 10m and 15m
- 4 Near field monitor
- 5 Marker beacon installation antenna assembly
- SECTION 2 SHELTER INSTALLATION
- 1 General
- 2 Mechanical installation LLZ/GP
- 3 Electrical Installation LLZ/GP
- 4 Mechanical Installation Marker Beacon
- 5 Electrical installation marker beacon
- 6 Remote Control Connections (TWR)
- SECTION 3 ANTENNA SYSTEMS ADJUSTMENTS PROCEDURE
- 1 NM 3522 6 elements antenna system adjustments - LLZ
- 1.1 Mechanical alignment of antenna array
- 1.2 Electrical measurements
- 1.3 Course sector width adjustment
- 1.4 Monitor combining unit (MCU) adjustments
- 1.5 Near field monitor adjustments
- 1.6 DC-Loop adjustment and testing
- 2 NM 3523B 12 Elements antenna system adjustments - LLZ (Single frequency)
- 3 NM 3524 12 Elements antenna system adjustments - LLZ (Dual frequency)
- 3.1 Mechanical alignment of antenna array
- 3.2 Electrical measurements
- 3.2.1 CSB and SBO cables
- 3.2.2 CSB/SBO phasing
- 3.2.3 Antenna cable lengths (Electrical phase equality)
- 3.2.4 Antenna pair phasing
- 3.2.5 Phase and amplitude transfer measurement
- 3.2.6 Antenna return loss
- 3.3 Course sector width adjustment
- 3.4 Monitor combining unit (MCU) adjustments
- 3.5 Near field monitor adjustments
- 3.6 DC-Loop adjustment and testing
- 4 NM 3525 24 Elements antenna system adjustments - LLZ
- 4.1 Mechanical alignments of antenna array
- 4.2 Electrical measurements
- 4.3 Course sector width adjustments
- 4.4 Monitor combining unit (MCU) adjustments
- 4.5 Near field monitor adjustments
- 4.6 DC-Loop adjustment and testing
- 5 NM 3526 16 Elements antenna system adjustments - LLZ
- 5.1 Mechanical alignments of antenna array
- 5.2 Electrical measurements
- 5.3 Course sector width adjustment
- 5.4 Monitor combining unit (MCU) adjustments
- 5.5 Near field monitor adjustments
- 5.6 DC-Loop adjustment and testing
- 6 NM 3543 Null reference antenna system adjustments - Glide path
- 6.1 Mechanical alignment of mast and antennas
- 6.2 Electrical measurements
- 6.3 CSB/SBO Phasing and sector width adjustment
- 6.4 Monitoring combining unit (MCU) adjustments
- 6.5 Location of near field antenna position
- 7 NM 3544 Sideband reference antenna system adjustment - Glide path
- 7.1 Mechanical alignment of mast and antennas
- 7.2 Initial electrical measurements
- 7.3 CSB/SBO Phasing
- 7.4 Sector width adjustment
- 7.5 Monitor combining unit (MCU) adjustments
- 7.6 Location of near field antenna position
- 7.7 Antenna distribution unit (ADU) phase and amplitude check
- 8 NM 3545 M-Array antenna system adjustments - Glide path
- 8.1 Mechanical alignment of mast and antennas
- 8.2 Initial electrical measurements
- 8.3 CSB/SBO Phasing
- 8.4 Sector width adjustment
- 8.5 Monitor combining unit (MCU) MOA 338D adjustments
- 8.6 Location of near field antenna position
- 8.7 Antenna distribution unit (ADU) DIA 346A phase and amplitude check
- 9 NM 3561 Single antenna system adjustments - MKR
- 10 NM 3562 Dual antenna system adjustments - MKR
- 1 NM 3522 6 elements antenna system adjustments - LLZ
- SECTION 4 TEST AND ADJUSTEMENTS
- 1 Tests and adjustments LLZ/GP
- 1.1 Configuration Settings
- 1.2 Transmitter Alignments and Calibration
- 1.3 Antenna System Adjustments
- 1.4 Monitor Alignment and Calibration.
- 1.5 Monitor Alarm Setting Procedure
- 1.6 Maintenance Limit Adjustments
- 1.7 Adjustment points
- 2 Tests and adjustments marker beacon
- 1 Tests and adjustments LLZ/GP
- SECTION 5 GROUND COMMISIONING REFERANCE DOCUMENTS
- SECTION 6 APPENDIX
- Diagram 1 Relative SBO vs CS Width, NM3522.
- Diagram 2 Relative SBO vs CS Width, NM3523B.
- Diagram 3 Relative SBO vs CS Width, NM3524.
- Diagram 4 Relative SBO vs CS Width, NM3525.
- Diagram 5 Relative SBO vs CS Width, GP antenna systems.
- Diagram 6 GP angle vs relative antenna height, NM3545.
- Diagram 7 GP angle vs relative antenna height, NM3544.
- Diagram 8 GP angle vs relative antenna height, NM3543.
- SECTION 1 ANTENNA INSTALLATION PROCEDURE
1250$5&
1DYLD$YLDWLRQ$6
,167580(17/$1',1*6<67(0
,167$//$7,21&200,66,21,1*+$1'%22.
4 Mechanical Installation Marker Beacon
This chapter gives a brief instruction on the mechanical installation of the Marker Beacon cab-
inet and antenna.
4.1 Marker beacon Cabinet
The NM7050 cabinet is constructed for mounting on a wall. For easy operation, the keyboard
and display section should be in eye/shoulder height (140-160cm).
The ventilation holes at the bottom of the cabinet should be kept uncovered to ensure proper
cooling.
The cabinet is 45 cm wide, 34 cm deep and 27 cm height and weighs about 5 kg.
When mounting the cabinet on a wall, do the following:
• First drill the holes according to Figure 4-1.
• Mount the upper screws. Leave 6 mm distance from the screw head to the wall.
• Hang the cabinet on these screws, using the key holes on the mounting rails
• Mount the lower screws
• Tighten all screws
•
Figure 4-1 Mounting the cabinet on a wall.
MARKER BEACON
ON
OFFOFF
BATTERY
ON
LOCAL RS232
POWER
MAINS
REMOTE
LOCAL
AUTO
MANUAL
WRITE
PROTECT
MAIN
TX TO AIR
+
ON/
OFF
STBY
MAINT
BATT
DISAGR
PARAM
ALARM
WARNING
OVER
CHANGE
NORMAL
SERVICE
TX1
ESC
-
PREV NEXT
READ
TX2
QUICK
ENTER
405
Hex lag screw 6x50
Hex lag screw 6x50
Washer M6
Washer M6
340
451 mm
5
HBK 860-1