Installation Instructions

Table Of Contents

.
Figure 1-1 Cable phasing measurements set-up.
1.2.2 CSB/SBO phasing
127(
$VFHUWDLQWKDWWKH7[PRGXODWRUXVHGLVRSWLPDOO\FDOLEUDWHG
Connect the NM3710 Field Test Set to the monitor BNC test connector in the ADU. (Use
20..30 dB attenuator at the I/P of the Field Test Set.)
Adjust SBO phaser in the Cabinet (associated with Tx to air) to obtain 0.0% DDM reading.
Repeat the phasing procedure for the other transmitter.
1.2.3 Antenna cable lengths (Electrical phase equality)
Each antenna cable should be electrically checked before the end connector is terminated in
the LPDA.
Utilise a vector voltmeter or network analyser. Establish antenna cable (A1) (leftmost seen
from rear) return phase as 0° reference phase.
Measure return phase for each of the remaining antenna cables (A2...A6).
Tolerance: ±1.0° true electrical cable length.
See measurement set-up diagram Figure 1-1.
1.2.4 Antenna pair phasing
127(
%HIRUHWKHDQWHQQDSDLUSKDVLQJSURFHGXUHLVFRPPHQFHGDVFHUWDLQWKDWWKH7[PRGXODWRUXVHGLV
RSWLPDOO\FDOLEUDWHG
20dB
AB
VECTOR VOLTMETER
From cabinet
CSB BNC o/
p
CABLE UNDER TEST
OPEN END
DIR. COUPL.