Cable trimming length: 6.2 mm/°.
4.2.5 Phase and amplitude transfer measurement
Connect each antenna cable and monitor cable to LPDA load and source respectively. Utilise
a vector voltmeter or network analyser in a test set-up Figure 4-2
.
Figure 4-2 Phase and amplitude transfer measurement set-up.
Measure relative transfer phase and amplitude for each Antenna/Monitor return cable in ref-
erence to A1/M1.
Pair
µ
A DDM
(6°)
% DDM
(6°)
A1/A24 20.1 2.08
A2/A23 18.5 1.91
A3/A22 16.8 1.74
A4/A21 14.9 1.54
A5/A20 13.2 1.36
A6/A19 11.4 1.18
A7/A18 9.7 1.00
A8/A17 7.9 0.82
A9/A16 6.2 0.64
A10/A15 4.4 0.45
A11/A14 2.6 0.27
A12/A13 0.9 0.09
20dB
AB
VECTOR VOLTMETER
A(n)
M(n)
From cabinet
CSB BNC o/p
LPDA
DIR. COUPL.