Hardware manual

Starting up fieldbus communication and programming the ABB PLC
85
15. Name the signals in the netConnect field. See the designation of the signals in the
image below.
Note: You can name all signals here and they will be automatically declared in the
Control Builder.
16. Check that the PLC is in the Stop state (Stop in the display).
Note: The downloading is not possible if the PLC is in the Run state.
Tool/Step
Setting up the communication