Use Manual

Table Of Contents
the CAR is secured at the aspiration
AccessPoint on the SAL.
Related information...
Use or function, page 31
Communication paths, page 33
Communication paths
The following figure shows the communication paths.
Figure 1: Flowchart of communication paths
Legend:
1.
Laboratory information system (LIS) with middleware
2. Track Workflow Manager (TWM)
3. Track Sample Manager (TSM)
4. GLP systems Track
The following list describes the communication paths:
1. The LIS sends the requested analyses to the middleware. The middleware then forwards
these analyses to TWM.
2. Using these analyses, TWM creates targets on the GLP systems Track, which are then
communicated to TSM.
3. TSM sends detailed instructions for where the sample should be processed on the track.
4. The track notifies TSM of the current location of the sample and the processing steps that
have been performed.
5. TSM sends this information to TWM. If necessary, this information is also forwarded to the
LIS with the middleware.
Related information...
GLP systems Track overview, page 32
Track Workflow Manager interface, page 72
Section 1
Use or function
GLP systems Track
overview
GLP systems Track Operations Manual
80003968-101 DRAFT - 2022-03-11
33
DRAFT 2022-03-11