Use Manual

Table Of Contents
Related information...
Installation procedures and special requirements, page 57
Track installation, page 59
Input/Output Module installation requirements, page 59
Track installation
Before the installation of the GLP systems Track, an Abbott Laboratories representative confirms
that the site is prepared. The system location must meet environmental specifications and
electrical requirements before the representative can install the system.
The representative unpacks, positions, and installs the system. During the installation, the
representative performs the system setup and confirms that the system operates within the
manufacturer's specifications.
After the installation, the customization or configuration of the system may be performed
before any testing is initiated.
IMPORTANT: Incorrect installation can cause damage to the track.
Related information...
Transportation, installation, disassembly, and disposal, page 58
Input/Output Module installation requirements
The Input/Output Module may only be installed indoors. The module is freestanding and is
not fixed to the floor. Water connections are not required. Contact an Abbott Laboratories
representative or an authorized service representative for more information about service
requirements.
Related information...
Transportation, installation, disassembly, and disposal, page 58
Section 2
Installation procedures and special requirements
Transportation, installation, disassembly, and disposal
GLP systems Track Operations Manual
80003968-101 DRAFT - 2022-03-11
59
DRAFT 2022-03-11