8.0

© 2009 ABBYY. All rights reserved.
23
You can also set up a checking procedure for recognized values to check if they belong to a certain
interval. To specify an interval, click Edit … next to the Validation field (Figure 9).
Figure 9. Value checks dialog box
Specify a data type for each text field. For the First and last name field, you must select the Name type and
specify the correct language. For the Processing volume field where the number of pages is indicated, select
the Number type (the format is an integer).
For the “Fill in date” field, select Date from the Content list. Then select from the list or describe the date
format. If you wish to check that the date is within the specified time interval, click Edit in the Validation area
and select the Date must be within the following interval option in the dialog box that opens. You may specify a
fixed or relative time interval. For example, you can specify the following time interval: 90 days before the
current date and 0 days after it. In this case, no error message will be displayed for questionnaires which were
filled out no earlier than 90 days before the current date and no later than the current date.
4.3.4.2.2. Data types for checkmarks
When selecting a data type for checkmarks on the Data Type tab, you specify the values to be assigned
to fields if their checkmarks are selected or not (Figure 10).
You can assign the following values to checkmark fields:
Yes if the checkmark is selected, No if the checkmark is not selected;
1 if the checkmark is selected, 0 if the checkmark is not selected;
Checkmark name if the checkmark is selected, Empty if the checkmark is not selected;
You can also select the Custom option and provide your own values.
Note. If checkmarks are combined into a group, they possess common properties. Properties are
specified only for the entire group, but checkmark values are also specified in the group properties.