User Manual
Table Of Contents
- Notice
- About This Guide
- Guide to Conventions
- Trademarks
- Table of content
- Table of Figures
- 1. Introducing ExaSAN PCIe2.0 Storage Systems
- 2. Preparing to Install ExaSAN B08S2-PS
- 3. Installing the ExaSAN B08S2-PS
- 4. Using RAIDGuardX GUI
- 4.1 Accessing the RAIDGuardX GUI
- 4.1.1 RAIDGuard X Client and Server
- 4.1.2 RAIDGuard X Menu Bar
- 4.1.3 Updating the ExaSAN RAID system Firmware
- 4.1 Accessing the RAIDGuardX GUI
- 5. RAID Overview
- 6. Appendices
3. Installation
User Guide Page 3-6
Figure 21: power on sequence
Caution
It is important to follow the correct Power O
n sequence. Failure to do so may
result in some features not functioning properly.
3.2.2 Powering Off
If you need to power off the entire system, such as in the cases of switch or RAID system firmware
updates, adding a RAID system or client computer, power off in the reverse order of Powering On. Before
turning off the B08S2-PS Storage System, turn off the host server first. During RAID initiation or disk
drive rebuilding, you can turn off the host server and leave the B08S2-PS powered on.