Altos User's Guide
Table Of Contents
- Notices
- Important safety instructions
- 1 System tour
- 2 System setup
- 3 System upgrade
- 4 BIOS setup
- 5 Troubleshooting
- Appendix A: Acer Altos R910 rack installation guide
- Appendix B: Memory configuration options
- Appendix C: Integrated SCSI hardware RAID configuration
- Index
25
Setting up the system
Pre-installation requirements
Selecting a site
Before unpacking and installing the system, select a suitable site for
the system for maximum efficiency. Consider the following factors
when choosing a site for the system:
• Near a grounded power outlet
• Clean and dust-free
• Stable surface free from vibration
• Well-ventilated and away from sources of heat
• Secluded from electromagnetic fields produced by electrical
devices such as air conditioners, radio and TV transmitters, etc.
Checking the package contents
Check the following items from the package:
• Acer Altos R910 system
•Acer EasyBUILD
TM
• Acer Altos R910 accessory box
If any of the above items are damaged or missing, contact your dealer
immediately.
Save the boxes and packing materials for future use.