Owner's Manual

Smart Server Manager v1.2 – Best Practices
35
After which, the user will be prompted to configure the rack they wish to setup. This step includes selecting
which machines will be managed, the desired power limit of the rack and each managed device’s power
grouping priority.
Establish a rack and set its maximum power.
Add devices to be managed and their grouping priority.