Installation Instructions

Table Of Contents
MTU Instruction
for Rockwell/Equimeter/Sensus Gas Meters
Step 6 – Position the clear register cover
on the front of the sensor and fasten the
assembly to the meter using the four 10-
24 x 1-1/2” screws provided. Hand
tighten these screws to a torque not to
exceed 12-15 inch pounds.
Step 8 – Mount the MTU, following the
wiring and mounting guidelines outlined in
Publication 471-2000, General
Installation and Wiring Guidelines. If
necessary, the MTU cable can be
extended up to 500 feet.
Step 7 - Replace any anti-tamper, safety,
or security hardware onto the plastic
cover as required.
Step 9 – Once Installation is complete,
program the MTU using your Field
Programmer and the STAR Programmer
Software.
Page 165