Installation Instructions

Table Of Contents
MTU Instruction
for Carson Industries 1015-5 Pit Lids
Step 6 – The MTU STAR logo should be
visible through the pit lid view door after
proper placement and mounting.
CAUTION!
Do not over tighten the zip ties
when mounting the MTU.
Excessive torque can bend
the MTU mounting tabs.
CAUTION!
Be sure to follow all General
Guidelines outlined in
Publication 471-2000 along
with the specific wiring
instructions for the meter
being used.
Step 7 – Wire the MTU to the meter,
folding and forming wires into valve box
as necessary so that they do not interfere
with lid locking mechanism and cannot
become pinched.
Step 8 – Installation is now complete.
You can now proceed to program the
MTU using the STAR Field Programmer
Software and your Field Programmer.
Page 178