Installation Instructions

Table Of Contents
MTU Instruction
for Alliance Rectangular Pit Lids
Step 2 – Position the MTU with the label
side face down against the underside of
the pit lid and thread plastic zip ties
through each of the drilled holes and
through the holes of the MTU mounting
tabs.
Step 3 – Gently pull through the zip ties
so that the MTU is secured to the pit lid.
Do not over tighten the zip ties.
Excessive torque may bend the
mounting tabs and break the seal of
the MTU. Tighten only until the MTU
contacts the lower surface of the pit lid.
Trim the excess length from the zip tie
ends.
CAUTION!
Do not over tighten the zip ties
when mounting the MTU.
Excessive torque can bend
the MTU mounting tabs.
CAUTION!
Be sure to follow all General
Guidelines outlined in
Publication 471-2000 along
with the specific wiring
instructions for the meter
being used.
Step 4 – Wire the MTU to the meter,
forming wires as necessary so that they
do not interfere with lid locking
mechanism and cannot become pinched.
Step 5 – Installation is now complete.
You can now proceed to program the
MTU using the STAR Field Programmer
Software and your Field Programmer.
Page 188