Installation Instructions

Table Of Contents
MTU Instruction
for Actaris/Sprague/Schlumberger Gas Meters
Step 12 – Next, remove one of the
alignment studs and replace it with
another one of the #10-24 x 2” screws
provided. Continue in a similar manner,
replacing the other alignment stud with a
#10-24 x 2” screw. Tighten all three
screws to a torque not to exceed 12 -15
inch-pounds. The gasket should be
compressed slightly. Be careful not to
over tighten the screws. Excessive torque
may damage the MTU enclosure.
Because of this, power tools are not
recommended for this procedure.
Step 13 - Replace any anti-tamper,
safety, or security hardware onto the
plastic cover as required.
Step 14 – Once Installation is complete,
program the MTU using your field
programmer and the STAR Programmer
Software.
Page 193