Installation Instructions

Table Of Contents
MTU Instruction
for Carson Industries 1419-3 and 1419-5 Pit Lids
Step 8 - Turn the lid over and verify that
the heads of the screws are flush or
below the lid surface.
CAUTION!
Be sure to follow all General
Guidelines outlined in
Publication 471-2000 along
with the specific wiring
instructions for the meter
being used.
Step 9 – Wire the MTU to the meter,
folding and forming wires into valve box
as necessary so that they do not interfere
with lid locking mechanism and cannot
become pinched.
Step 10 - Installation is now complete.
You can now proceed to program the
MTU using the STAR Programmer
Software and your MTU Programmer.
Page 35