Installation Instructions

Table Of Contents
MTU Instruction
for AMCO and ABB Water Meters
Step 3 – Make a final visual check of the
wiring from the MTU to the meter register.
Verify that the cable routing is neat,
secure and professional.
Step 4 – Once installation and wiring are
complete, program the MTU using the
STAR Programmer Software and your
MTU Programmer.
V100/PSMT
MTU Cable V100/PSMT Cable
Red Red
Black Blue
White Blue
No Connection Black
No Connection Yellow
S130/5UM Hot Water
MTU Cable S130/5UM Cable
Red Brown
Black White
White White
S130/5UM Cold Water
MTU Cable S130/5UM Cable
Red Brown
Black White
White White
Page 53