User's Manual

Table Of Contents
MTU Instruction
for Armorcast Composite Pit Lids
Purpose & Scope
This instruction provides a procedure for mounting a STAR MTU to an Armorcast
Composite Pit Lid. This procedure covers the mounting of an Original Flatpak STAR MTU
or the New Flatpak STAR MTU to these pit lids. This procedure does not detail the wiring
of the MTU to the meter inside of the pit. Please refer to Publication 471-2000, General
Installation and Wiring Guidelines in addition to any meter specific MTU installation and
programming instructions.
Parts Required
Item Part Number Quantity
MTU As required for installed
meter
1
Hillman #370342 (10-12x1”) Anchors
2 per
installation
#8 x 2” Galvanized Sheet Metal Screws
2 per Original
Style MTU
installation
Long Spacers (for pit lid mounting of New Style Flatpak
MTUs)
056-8150L
2 per New
Style MTU
installation
#8 x 2 1/2” Galvanized Sheet Metal Screws
2 per New
Style MTU
installation
Tools Required
To mount the MTU to these pit lids, you
will need the following tools and
equipment:
Safety goggles
#2 Phillips driver bit
Hammer
#2 Phillips Screwdriver
Cordless Drill 3/8”, variable speed,
with adjustable torque settings.