User's Manual

Table Of Contents
MTU Instruction
for Sprague/Actaris 'Curb-type' Gas Meters
Step 6 – Place the gasket provided onto
the meter, aligning it as shown to insure
that the openings for the index cover bolts
match up with the threaded holes on the
top of the meter. Use the two (2)
alignment studs to aid in alignment and
assembly of parts.
NOTE: PG&E Code 23-2097 for cover
gasket and Code 23-4931 for plastic
cover.
Step 7 – Position the pulser and index on
the meter, aligning the four holes with the
threaded holes on top of the meter.
Ensure that the coupler on the pulser
engages the drive dog on the meter. You
can orient the index in any direction.
Step 8 – Place the supplied index cover
and notched index cover gasket on the
pulser, again aligning the notches in the
gasket with the index mounting posts.
Then fasten the assembly to the meter
using the four #10-32 x 2” brass machine
screws provided. Alternately tighten
opposite screws to evenly compress the
gaskets.
NOTE: Use “red” security caps and
“putty” to seal screw wells.
Page 147