MTU Instruction
for Rockwell/Equimeter Model 750-10000 Gas Meters
Step 7 – Pull most of the slack out of the
cable (leave a slight amount of slack) and
reattach cable clamp as shown below.
DO NOT pull the cable taut.
Step 8 – Tighten the nut on the sealtight
strain relief. You will need to tighten the
nut almost fully down (as shown) before it
will bite on the MTU cable.
Step 9 – Check that all wired terminal
block screws are tight.
Step 10 – Depending on the installation
location, you may be able to mount the
MTU at this time. During installation, the
IPT body should be supported so as not
to hang (apply tension) on the MTU
cable. During the installation, do not allow
the heavier body of the IPT to suddenly
jerk the MTU cable as this could
potentially damage the cable internally.
Step 11 – Install the MTU into its
intended location per the recommended
procedure found in the standard
Hexagram MTU installation manual.
Installing the Pulsimatic
Transmitter
Step 1 – If necessary, remove tamper
seals that cover the index cover screws.
Loosen and remove screws securing the
index cover. You may discard these
screws as they will not be re-used.
Remove the cover. If the cover has the
tamper seal bosses, this cover will be
need to be replaced.
Step 2 – Loosen and remove the screws
securing the index to the index plate.
Save these screws as they will be re-
used. Remove the index and set aside.
Page 69