User's Manual

Table Of Contents
MTU Instruction
for American Model AL800-AL5000 Gas Meters
Step 7 – Place the IPT (4 corner holes)
over the mounting studs. Make sure that
the IPT drive pin engages the fork of the
meter drive foot.
Step 10 – Install Wire/Lead security seals
if desired. Installation is complete.
Step 8 – Before mounting the index plate
assembly, the drive foot of the index must
engage the fork of the IPT drive shaft.
Mount the index plate assembly onto the
base of the IPT over the same (4) corner
studs.
Step 9 – Complete the assembly by
securing the index plate onto the studs,
with the supplied (4) flat washers and
nuts. Tighten these nuts a finished torque
of 60 inch-lb. (5 ft-lb.).
Page 77