2. INSTALLATION PREREQUISITES
2.1. SAFETY
Refer to safety instructions, safety standards and procedures before installing any device.
2.2. SITE SURVEY
At this step the site survey is done.
The location of the gateway, sensors and expanders are identified in a site plan and ensure
to each sensor the appropriate radio coverage.
2.3. FASTENING SUPPORT
The gateway must be placed on a wall or a pole at a height of about 5m [16 ft].
Adequate mounting support has to be installed on site (such as mast) if necessary and can
therefore require the use of support facilities and operations of specific civil engineering if
needed for the configuration of the area.
2.4. NETWORK AND POWER
The gateway has to be powered and connected to the customer IP network
Prior to installation, the site must be equipped with both power and ethernet connections.
A technical cabinet can be necessary. The link to the customer IP network can be fiber-optic,
copper…