User's Manual

31
Figure 31: ball-joint base, arm, and ball-joint head for expander mount
Figure 32 : ball-joint mount installation
5.2.2.
Direct mounting
See « Figure 25: direct mounting with M6 stud » on page 32
No need of flat surface Step 3.
Drill a hole (Ø5mm and XXmm depth [Ø 13/64 in - ) Step 4.
Thread the hole with M6 tap Step 5.
Screw M6 stud with a length of XXmm Step 6.
CAUTION: The part of the stud inserted into the expander can be up to 6 mm. A
bottoming stud may cause base-strain and also potentially damage electronics.
Screw the sensor on the stud and tighten at 5 - 7 Nm using the dedicated tube Step 7.
wrench and your handgrip.
CAUTION: If you use a 44 wrench or an adjustable wrench be careful to observe
the indicated torque range.
Fill in the installation report with expander information (S/N, location,…) Step 8.
5.2.3.
Cementing pad mounting
See Chapter 3 § 0 «
ILLUSTRATIONS
montage BALL-
JOINT RAM MOUNT
POUR EXPANDER