C H A N N E L I N S TA L L AT I O N G U I D E IN-WALL CHANNEL Complete Integrated LED Lighting Solutions Tech Support: 212.629.
M AT E R I A L L I S T (A) (B) (C) (D) Channel Screws Rubbing Alcohol Double Sided Tape (E) (F) (G) RibbonLyte Lens Spring Clip PA G E 1 All artwork and images copyright Acolyte Industries Inc. Use or reprinting prohibited unless explicitly approved by Acolyte Industries.
I N S TA L L AT I O N - - S T E P S 1 - 4 1 Clean the channel mounting surface (A) with a cloth and Rubbing Alcohol (C) to remove dust and debris from the channel. 2 After surface is dry, apply 1/16” double-sided tape (D) to the inside of the channel (A), where the RibbonLyte (E) will be applied. (A) (D) (C) 3 Remove backing from double-sided tape (D). 4 Remove the backing from the RibbonLyte (E) that you are going to be applying atop the double-sided tape.
I N S TA L L AT I O N - - S T E P S 5 - 7 5 Apply the RibbonLyte (E) atop the double-sided tape inside the channel, making sure the RibbonLyte sits completely flat. (A) (E) 6 Slide the lens (F) into place. 7 Rout or cut a slot in your desired installation material that fits the width and depth of your channel (A). Drill a pilot hole for screws that align with the hole of the spring clip. (F) PA G E 3 All artwork and images copyright Acolyte Industries Inc.
I N S TA L L AT I O N - - S T E P 8 - 9 8 Insert Spring Clip (G) into the cut out area and align with the pilot hole. Screw the Spring Clip into place. 9 Snap the channel (A) into the cut-out area so that the channel flanges sit flush with the mounting material. (B) (A) (G) PA G E 4 All artwork and images copyright Acolyte Industries Inc. Use or reprinting prohibited unless explicitly approved by Acolyte Industries.
I N S TA L L AT I O N I S C O M P L E T E - Your In Wall Channel installation is complete. PA G E 5 All artwork and images copyright Acolyte Industries Inc. Use or reprinting prohibited unless explicitly approved by Acolyte Industries.